fse-logo_side-area

FEATURED PROJECTS

70 MILLION+ SQUARE FEET OF FIELD INSTALLATIONS AND COUNTING

From Walmart, to Amazon, to BMX and Vanguard, Fleming Steel Erectors is the PEMB Assembly Partner for Some of the Midwest’s Largest Construction Projects.

Completion of Last Mile Distribution Center Wraps Fifth Project Between FSE and Global E-Commerce Company

Fleming recently completed the structural steel and roofing portion of an Oklahoma City last mile distribution center for a widely recognized global e-commerce company.

The 120K square foot project is the fifth building partnership between Fleming and the client and the nineteenth partnership between Fleming and Industrial Developers of Oklahoma (IDO).

Working within an accelerated 10-month schedule Fleming was able to meet all deadlines and bring the project in on-time and under budget with zero safety issues. Deadlines were met in spite of supply chain shortages and on-site complications resulting from the Covid-19 pandemic.

Download the One Sheet

FSE—BUTLER MR-24 STANDING SEAM METAL ROOFING EXPERTS

At Fleming Steel Erectors, we believe that the quality and integrity of a roofing system is vital to the overall health and longevity of a building.
That’s why we recommend Bulter’s MR-24 standing seam metal roofing system for every division 13 project we take on.

The Fleming team has been installing Butler roofing since 1969, and some of our original collaborations are still going strong!

Download the One Sheet

Vanguard Reefer Trailer
Manufacturing Plant

In spring of 2020, we began assembly on a 255K square foot reefer trailer manufacturing plant in Monon, Indiana. Its design includes a 32’ eave and 8 bridge cranes.

By assembling the modules on the ground, we eliminated 50% of the higher-risk elevated work. This method is both faster and safer. After the modules were assembled, two cranes lifted them into position.

The FSE crew, in collaboration with JM Williams Contractors, worked through heavy spring rains and the Covid-19 pandemic to get the job done on stated timelines, safely and with no incidents.

Download the One Sheet

300K Square Foot Amazon
Sort Facility

Steel Work Completed in Just Ninety Days, Full Project Completed in Eight Months with Expedited Permits

In partnership with Industrial Developers of Oklahoma, Fleming built the 300K sq. ft. Oklahoma City Amazon sorting facility in just eight months from ground breaking to certificate of completion.

The project involved concrete tilt, Butler Landmark structural system, and a MR-24® standing seam roof system. FSE’s steel portion of the project was completed in just ninety days.

Download the One Sheet

Skycam

FSE Provides Steel Building Erector Services for Skycam’s Original Headquarters

Skycam, the company behind the aerial camera systems used to film sporting events ranging from professional football to the Olympics, was originally located in Broken Arrow, OK before moving to Fort Worth, Texas. While in Oklahoma, Skycam commissioned the Fleming Construction Group to build their 50,000 square-foot headquarters.

Download the One Sheet

Sulzer Chemical

Fleming Steel Erectors completed the pre-engineered metal building aspect of the Sulzer Chemical campus, which consists of a 30,000 square-foot, two-story office building and a 77,250 square-foot manufacturing facility. The office building features three fully enclosed concrete rooms that serve as safe rooms and operation centers. The 210 ft. x 325 ft. manufacturing building has two five-ton bridge cranes and a one-ton bridge crane, in addition to a high-pressure test stand area, and an engineered concrete pit.

Download the One Sheet

Regal Plaza

FSE Erects Nearly 600K Square Feet of Structural Steel for Convention Center and Retail Plaza

The Regal Plaza Convention Center buildings, completed in 2008, make up a high-profile, multi-purpose campus encompassing a full city block. The versatile property, which has changed hands since its construction and is currently owned by a church, includes nearly 600K square feet of gathering and retail space.

Download the One SheetWatch the Video

Hahn Appliance Warehouse

Fleming Steel Erectors provided the structural steel erection portion of Hahn’s Tulsa facility, which features 90,000 square feet of warehouse and 50,000 square feet of showroom and gallery space. The warehouse, designed with 30-foot clear height and concrete tilt panels, includes docking bays of various heights to accommodate all sizes of trucks. The building was completed on time, with more than $500,000 in value-engineered savings.

Download the One Sheet

CLEAR EDGE FILTRATION:

155K SQUARE FOOT CONSTRUCTION MOVES MANUFACTURING FACILITIES CLOSER TO US HEADQUARTERS

The Clear Edge Filtration facility in Tulsa, Oklahoma replaced two New York facilities, moving the company’s US manufacturing operations closer to its corporate headquarters, which are also located in Tulsa.

Download the One Sheet

Centergate Business Park

Industrial Developers of Oklahoma (IDO) transformed the remaining 900,000 square feet of the former Ford Glass Plant into a multi-tenant complex. Fleming Steel Erectors partnered with the developers to erect the structural steel pre-engineered metal buildings on the 187-acre campus.

In addition, Fleming Steel Erectors roofed all projects featuring MR-24® Standing Seam Roofing.

Download the One Sheet

Division 13 Pros – Walmart

Back in the 1990’s and early 2000’s, Fleming completed 45 DC’s for Walmart.
The 1.1 million square foot building pictured here was assembled in just 31 days.

Built Fast. Built Safe. Built Right.

Find Out How We Can Help You on Your Next Pre-Manufactured Building Project.

Contact Us